曰韩在线视频_免费高清视频一区二区三区|HD中文字幕在线播放,久久久水蜜桃,久久亚洲春色中文字幕久久,日韩久久精品一区二区三区官网

PRODUCT OPTIMIZATION
01
The product ID and MD were designed by "NewPlan", after one and a half months of product optimization, more than 800 problem points were found.
02
The original cost of mold was ¥2.65 million, and the cost of mold after optimization is ¥2.25 million.
03
The mold T0 development cycle is 50 days, and the appearance of the product will be textured at T0.
04
Since the start of mass production in 2019,
the mass production has reached more than 50W sets.
05
263pcs original parts,
202pcs after optimization.
352 Air Cleaner